Tools · run a check
Test the plan,
then make the decision.
Each tool turns explicit inputs into an alert, a scenario or a decision condition. Assumptions and reading limits remain visible.
Coherence diagnostic
Assess eight plan connections. The score identifies the first priority to check and leads to the appropriate control and a downloadable or locally stored result.
- 01Assess
- 02Score
- 03Priority
- 04Control
- 05Save
Pre-filled example: adjust the eight criteria to your plan.
4 connections to secure.
First correct the most structuring items before adding new initiatives.
Compare committed resources with the workload actually available.
Result generated in your browser. Storage remains limited to this device, with no account or data transmission.
Indicative reading · documented weights · does not determine the strategic quality of objectives.
Budget × capacity
Compare the full cost and required workload with the resources actually available after contingency.
Convention: a cost or required workload of 0 displays 100%, because there is then no need to cover.
First reduce initiatives with a low contribution or move their milestones. An even reduction would hide the real choices.
Scoping estimate · workload measured consistently, including coordination, validation and rework.
Launch readiness
Turn a feeling of readiness into a conditional decision with blockers, owners and resolution dates.
1 critical prerequisite(s) prevent the launch, regardless of the total score.
Governance check · each blocker requires an owner, a due date and an escalation rule.
