TOOL 01

Coherence diagnostic

Assess eight plan connections. The score identifies the first priority to check and leads to the appropriate control and a downloadable or locally stored result.

  1. 01Assess
  2. 02Score
  3. 03Priority
  4. 04Control
  5. 05Save
01 · Formalised items4/8

Pre-filled example: adjust the eight criteria to your plan.

02 · Plan healthMethod v1
52/100
To secure

4 connections to secure.

Correction priorityJustified and phased budget

First correct the most structuring items before adding new initiatives.

04 · Recommended checkCheck budget and capacity

Compare committed resources with the workload actually available.

Continue the check

Result generated in your browser. Storage remains limited to this device, with no account or data transmission.

Indicative reading · documented weights · does not determine the strategic quality of objectives.

TOOL 02

Budget × capacity

Compare the full cost and required workload with the resources actually available after contingency.

Budget × capacityCentral scenario
ResultAfter contingency
Fundable84%
Executable85%
Secured budget: €442k
Deployable capacity: 820 d

Convention: a cost or required workload of 0 displays 100%, because there is then no need to cover.

TRADE-OFF REQUIRED€83k to remove or fund · 140 days of overload

First reduce initiatives with a low contribution or move their milestones. An even reduction would hide the real choices.

Scoping estimate · workload measured consistently, including coordination, validation and rework.

TOOL 03

Launch readiness

Turn a feeling of readiness into a conditional decision with blockers, owners and resolution dates.

Launch readiness5/8 ready
Recommended decisionNO-GO

1 critical prerequisite(s) prevent the launch, regardless of the total score.

Governance check · each blocker requires an owner, a due date and an escalation rule.