Evidence for planning

Connect a planning decision to evidence.

This collection examines scientific publications that can change a method, schedule or measurement rule. Each analysis states what to retain, what to verify and what cannot be generalised.

01 / Directory

Available analyses

Review the validated analyses here before changing a plan, a measurement or an execution protocol.

02 / Method

Check before applying

  1. 01
    Start with the decision

    Each analysis addresses a precise planning decision.

  2. 02
    Read the method

    The sample, variables, period, protocol and limitations determine its scope.

  3. 03
    Compare contexts

    The studied context is compared with the market, the channel and the horizon of the plan concerned.

  4. 04
    Connect to action

    The conclusion states what can change in the plan and what remains to be checked.