C01Core page

A marketing plan is not written. It is made executable.

Choose the right entry point in the planning cycle.

System map
C02Pillar page

Turn strategy into objectives, budget and a roadmap

Choose the plan scope, structure and level of detail.

Plan canvas
C03Guide

Structure a usable marketing plan

Keep only sections that support a decision or a control.

Annotated structure
C04Guide

Distinguish marketing strategy from the marketing plan

Separate strategic choices from execution commitments.

Strategy–plan matrix
C05Guide

Distinguish the marketing plan from its roadmap

Define what belongs in the plan and what the roadmap should visualise.

Plan–roadmap comparison
C06Control

Assess marketing-plan quality

Determine whether the plan can be approved or must be corrected.

Quality grid
C07Pillar page

Set the mandate, baseline and constraints before planning

Freeze the working mandate and the minimum data to collect.

Framing brief
C08Guide

Define the scope of the marketing plan

Define the boundaries that make the plan comparable and governable.

In–out matrix
C09Guide

Build the marketing-plan baseline

Freeze the reference against which variances will be measured.

Baseline table
C10Template

Formalise the plan assumptions

Choose which assumptions should become conditional decisions.

Assumption register
C11Guide

Gather the data needed for the marketing plan

Separate indispensable data from useful but non-blocking information.

Data inventory
C12Pillar page

Connect business outcomes, marketing objectives, initiatives and measures

Select the objectives and indicators that will genuinely trigger action.

Objectives tree
C13Guide

Build a marketing objective tree

Validate the contribution relationships before funding initiatives.

Documented objective tree
C14Guide

Choose the marketing-plan KPIs

Remove metrics that change no decision.

KPI dictionary
C15Template

Build a KPI tree

Organise measurement without multiplying decorative indicators.

KPI tree
C16Pillar page

Compare initiatives by contribution, cost and feasibility

Fund, defer, test or stop each initiative.

Initiative comparator
C17Guide

Turn strategy into initiatives

Choose the initiatives that genuinely make the strategy tangible.

Strategy–initiative tree
C18Template

Build a marketing initiative portfolio

Create a consistent basis for trade-offs without double counting.

Normalised portfolio
C19Guide

Define prioritisation criteria

Choose a trade-off rule that is understood and defensible.

Weighted grid
C20Pillar page

Find missing links before they become execution gaps

Prioritise the corrections that determine whether the plan is feasible.

Health score
C21Control

Align objectives and initiatives

Correct, justify or remove weak relationships.

Contribution matrix
C22Control

Check budget–capacity coherence

Rephase, reduce, fund or stop infeasible initiatives.

Budget–capacity control
C23Control

Align objectives and KPIs

Complete or remove indicators that cannot steer a decision.

Objectives–KPI control
C24Control

Calculate the plan health score

Prioritise corrections without confusing score with strategic quality.

Score and report
C25Pillar page

Build a budget that reflects full cost and real capacity

Trade off budget, workload, timing or scope.

Budget–capacity calculator
C26Guide

Build a zero-based marketing budget

Recompose the budget envelope according to expected contribution.

Zero-based grid
C27Guide

Calculate the full cost of a marketing initiative

Compare initiatives using a consistent cost convention.

Full-cost calculation
C28Template

Build a marketing capacity plan

Rephase, reinforce, outsource or reduce the portfolio.

Workload plan
C29Template

Compare budget scenarios

Choose a budget envelope and the conditions that will trigger its review.

Budget comparison
C30Pillar page

Sequence initiatives by milestones, prerequisites and capacity

Set the sequence, the milestones, the margins and the decision dates.

Roadmap generator
C31Guide

Define marketing-roadmap milestones

Keep the points that change the state of the plan.

Milestone register
C32Template

Map roadmap dependencies

Secure, decouple or rephase critical dependencies.

Dependency map
C33Control

Identify the marketing critical path

Protect the resources and decisions that condition the date.

Critical path
C34Pillar page

Assign decision rights, ownership and review rules

Establish responsibilities and the decision path.

Governance builder
C35Template

Build a marketing RACI matrix

Clarify roles and identify overloads or missing responsibilities.

Checked RACI
C36Guide

Define marketing decision rights

Reduce implicit trade-offs and late approvals.

Decision matrix
C37Guide

Run a marketing steering committee

Set the agenda, participants, evidence and expected decisions.

Decision agenda
C38Pillar page

Compare plan with actuals and document corrective decisions

Continue, correct, reallocate, rephase or stop.

Guided review
C39Control

Analyse marketing-plan variances

Decide whether a variance should be tolerated, corrected or escalated.

Variance typology
C40Guide

Build a marketing-plan reforecast

Approve a new forecast and its review conditions.

Reforecast template
C41Control

Assess launch readiness using evidence

Issue a go, restricted go or no-go with dated conditions.

Evidence-based readiness index
C42Use case

Build a product-launch plan

Validate the target, strengthen a link or reduce ambition before committing budget.

Complete launch economics
C43Guide

Prepare launch sales enablement

Produce, test, correct or retire each enablement asset.

Risk–evidence–asset grid
C44Control

Run the post-launch review

Accelerate, correct activation, narrow the segment or stop the expansion.

Cohort adoption curve
C45Guide

Run a marketing sensitivity analysis

Strengthen evidence, set a threshold or fund protection for the dominant variables.

Pipeline sensitivity chart
C46Template

Build a marketing risk register

Prevent, transfer, mitigate, accept or escalate each material risk.

Residual risk set
C47Template

Build a marketing contingency plan

Activate the appropriate response without reopening the whole plan trade-off.

Trigger-response matrix
C48Comparison

Choose a decision rule under uncertainty

Choose a proportionate method and document its limits.

Four-method comparator
C49Use case

Reduce a marketing budget by 10%

Remove, renegotiate, rephase or protect each budget line.

Costed selective-cut case
C50Use case

Reduce a marketing budget by 20%

Choose the recomposition method and explicitly accept the outcomes that are abandoned.

Critical comparison of cuts
C51Use case

Launch a new offer in stages

Continue, correct, limit the segment or stop at each gate.

Grid of five funded gates
C52Use case

Prepare a marketing executive committee

Secure a decision, an accountable owner and a due date for every item submitted.

Decision note template
C53Template

Build a one-page marketing plan

Validate a compact decision view without confusing it with the detailed plan.

One-page relational canvas
C54Control

Detect frequent marketing-plan errors

Correct, temporarily accept or block approval according to observed severity.

24-control set
C55Use case

See a complete quantified marketing-plan example

Check that the economic chain remains coherent before approving the portfolio.

Versioned annual case
C56Template

Build a decision-ready marketing-plan brief

Accept the brief, accept it with conditions or suspend the start.

Eight-criterion brief gate
C57Template

Build a marketing stop-doing list

Stop, reduce, transfer or maintain each existing activity.

Documented stop index
C58Control

Address objectives without action

Fund an action, reduce the target or explicitly accept the uncovered objective.

Coverage exception register
C59Control

Identify initiatives with no owner

Assign, delegate, split or suspend the initiatives that cannot be governed.

Ownership dataset
C60Control

Calculate budget × capacity feasibility

Reduce, rephase, reinforce or fund the portfolio before commitment.

Joint-feasibility calculator
C61Comparison

Defend a marketing budget in committee

Choose an argument proportionate to uncertainty and available alternatives.

Critical comparison of arguments
C62Control

Compare planned and actual marketing performance

Tolerate, correct, rephase or reforecast depending on the nature and persistence of the variance.

Planned–actual comparison
C63Template

Build an annual marketing plan

Set commitments, gates and review rights for the twelve months.

Downloadable annual calendar
C64Comparison

Compare marketing prioritisation methods

Choose the appropriate prioritisation method and document what it does not measure.

Critical four-method comparator
C65Comparison

Choose leading and lagging KPIs

Keep one outcome metric, two leading signals and one guardrail for each objective.

Critical leading–lagging comparison
C66Control

Calculate marketing decision thresholds

Define green, amber and red zones before observing results.

Material threshold calculation
C67Control

Trade off value, effort and uncertainty

Fund, test, reconfigure or reject each initiative.

Value–effort–uncertainty grid
C68Guide

Trigger a reforecast from a return signal

Maintain, freeze or reopen the envelope without recalculating the mix on this page.

Reforecast decision file
C69Guide

Size a marketing contingency reserve

Set the central reserve, ceiling and release rules.

Residual-exposure calculation
C70Control

Plan critical marketing roles

Rephase, split, delegate or reinforce critical capacity.

Workload by role and week
C71Comparison

Compare sequencing methods

Choose the primary method and complementary roadmap control.

Four-method comparison
C72Template

Formalise a marketing escalation protocol

Resolve locally, escalate or trigger an exceptional decision.

Downloadable escalation protocol
C73Control

Define initiative stop rules

Continue, correct within a deadline, reduce exposure or stop.

Stop-rule grid
C74Guide

Manage a launch by cohorts

Accelerate, fix onboarding or limit acquisition depending on the cohort.

Activation cohort set
C75Use case

Check execution of an approved price

Authorise or block the launch depending on whether all critical evidence is present.

Pricing readiness checklist
C76Guide

Bound a learning-value heuristic

Reject, investigate further or provisionally keep a learning device with its assumptions made explicit.

Learning-value heuristic
C77Template

Map marketing-plan stakeholders

Set the level of involvement, the timing of each request and the deputy for every stakeholder.

Stakeholder engagement matrix
C78Guide

Cascade a business target into marketing objectives

Validate an achievable target or change rates, timing, segment or resources.

Range-based cascade calculation
C79Comparison

Define an evidence contract before commitment

Authorise, cap, defer or revise the commitment according to the evidence contract.

Evidence contracts by decision
C80Use case

Calculate an initiative’s opportunity cost

Fund now, rephase, reduce scope or preserve capacity for a superior option.

Worked scarce-capacity example
C81Control

Visualise coverage of plan objects

Fix first the nodes whose absence exposes several downstream decisions.

Original coverage graph
C82Template

Fund initiatives under budget and capacity constraints

Commit, rephase or block each initiative tranche before optional release.

Initiative allocation set
C83Guide

Size marketing-roadmap buffers

Set the size, location and consumption thresholds of each buffer.

Buffer calculation by aggregated uncertainty
C84Comparison

Compare RACI, DACI and RAPID

Choose one primary model for each decision type and avoid overlapping them.

Critical role-model comparison
C85Control

Measure forecast accuracy and bias

Keep the method, correct the bias, shorten the horizon or change the assumptions.

Original forecast-accuracy series
C86Template

Make an approved ICP executable

Open, condition or block ICP activation without reselecting the segment.

ICP execution gate
C87Template

Build a 90-day go-to-market plan

Authorise each phase, limit exposure or replan before the next launch.

Downloadable 90-day plan
C88Use case

Stress-test the marketing plan

Keep the plan, activate a contingency, reduce exposure or switch scenario.

Quantified combined-stress case
C89Control

Validate and approve a marketing plan

Approve, approve conditionally, limit or return the plan for correction.

Four-state approval gate
C90Template

Map marketing-plan constraints

Accept, negotiate, work around, insure or verify each constraint before planning.

Qualified constraint set
C91Guide

Trade off a marketing-objective portfolio

Commit, condition, reduce or defer each objective before allocating initiatives.

Original objective-tension profile
C92Comparison

Assess the evidence level of a marketing initiative

Cap investment according to evidence strength and the cost of error.

Critical comparison of five evidence levels
C93Control

Check risk–initiative coverage

Strengthen control, fund contingency, decouple or reduce exposure.

Propagated residual-exposure index
C94Use case

Calculate the cost of marketing inaction

Act now, fund a pilot, wait for evidence or explicitly accept the loss.

Six-month costed inaction case
C95Guide

Sequence the roadmap by cost of delay

Change sequence, split an initiative or protect a resource according to the value lost.

Two-sequence comparison
C96Template

Keep a marketing decision log

Close a decision while keeping it open to revision without reconstructing its history.

Downloadable decision log
C97Control

Detect weak marketing-plan signals

Observe, diagnose, correct or reforecast depending on persistence and convergence.

Multivariable weekly series
C98Comparison

Sequence the opening of approved channels

Open, condition, prepare or defer each channel without re-ranking the mix.

Sequenced opening register
C99Guide

Update marketing-scenario probabilities

Keep a pilot running, strengthen the evidence, scale up or stop according to pre-set thresholds.

Sequential probability calculation
C100Use case

Reschedule a delayed launch

Wait, isolate a pilot, narrow the segment or move the irreversible investments.

Costed delayed-launch case
C101Template

Communication plan: method, calendar and accountability

Commit, reschedule or withdraw an action according to its contribution, production capacity and approval prerequisites.

Communication commitment calendar
C102Control

Event plan: critical path, accountability and contingencies

Maintain, condition, scale down or postpone the event according to the state of the critical path and the contingency plans.

Event readiness register
C103Template

CRM plan: contact pressure, consent and incremental value

Commit, cap or suspend each sequence according to its net value per 1,000 sends, after unsubscribes, within the segment’s pressure budget.

CRM relationship calendar under a pressure budget
C104Template

Content plan: capacity, maintenance and value per committed day

Produce, postpone or decline each piece of content according to its value per committed day and the capacity left after maintaining the existing stock.

Editorial portfolio under capacity
C106Template

ABM plan: account coverage, buying committee and exposed value

Concentrate, open, maintain, monitor or hand over to sales each account according to its exposed value and the presence of an intent signal.

Account coverage matrix
C107Template

Steering committee KPIs: the indicators that trigger a decision

Keep, send back to operational monitoring or remove each indicator according to whether crossing its threshold triggers a committee decision.

Committee KPI grid
C108Template

Steering committee deck: a decision-by-decision template

Include, postpone or remove each topic from the deck according to whether it carries an explicit, costed request for a decision.

Committee deck template
C109Comparison

Marketing budget as a percentage of revenue: benchmark, limits and customer-value calculation

Keep the objective-based budget if it stays below the ceiling set by customer value, and use the percentage of revenue only as a consistency check.

Budget method comparison
C110Control

International marketing plan: common core, local adaptations and comparability

Make each element common, local or optional according to the gap between the saving from one shared version and the local contribution lost by not adapting it.

Common, local or optional decision grid
C105Guide

B2B marketing plan: an executable model for budget, capacity and KPIs

Approve, condition or rephase the plan before committing budget and teams.

Executable B2B template and review grid