Structured template · MOD-10

Full-cost marketing budget to download: fields and controls

Decision question

What is the initiative’s real cost beyond the supplier invoice?

Editable CSV file

The template’s required fields.

This file is used to compare options using one shared cost convention. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.

01

External spend

List purchases and services.

Taxes and currencies are consistent.
02

Internal workload

Value days by role.

The valuation rate is documented.
03

Coordination

Include approval, rework and steering.

Cross-functional workload is not omitted.
04

Contingency

Bound cost uncertainty.

The percentage and its base are visible.

Example structure

A concrete reading before completing the file.

Illustrative example to replace with plan data.
ItemBaseContingencyTotal
Media€80k5%€84k
Team€42k10%€46.2k

Checks before use

  • Same period
  • Same currency
  • Internal time included
  • Total = (external + internal + coordination) × (1 + contingency) + exit, without intermediate rounding

Counter-example

Completing “External spend” without satisfying “Taxes and currencies are consistent.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.

Editable resource

Download the template and retain its history.

Editable CSVDownload the full-cost budgetReview the example and acceptance criteria

Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.

Template traceability

Editorial revision of this page.

Revision 1.1

  • Reviewed on 22 August 2026
  • Editorial owner: Marketing Plan in Action
  • Counter-example, blocking check and visible history added.
  • This revision describes the page; the CSV retains its own version field when present.

Explore the method