Marketing stop-doing list to download: fields and controls

Decision question

What must be stopped to make the plan genuinely executable?

Editable CSV file

The template’s required fields.

This file is used to stop, reduce or maintain an activity with a date and an owner. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.

01

Activity

Name precisely what is ending.

The stopping scope is unambiguous.
02

Rationale

Connect the stop to a trade-off.

The rationale is not merely a lower preference.
03

Resources released

Quantify recovered budget and workload.

Availability is dated.
04

Exit

Manage dependencies and residual risk.

An owner is accountable for closure.

Example structure

A concrete reading before completing the file.

Illustrative example to replace with plan data.
ActivityBudget releasedDependencyStop date
Monthly webinar€18kPlatform contract30 September
B2C newsletter12 dConsent database15 October

Checks before use

  • Dated saving
  • Exit cost included
  • Dependencies addressed
  • Closure evidence

Counter-example

Completing “Activity” without satisfying “The stopping scope is unambiguous.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.

Editable resource

Download the template and retain its history.

Editable CSVDownload the stop-doing listReview the example and acceptance criteria

Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.

Template traceability

Editorial revision of this page.

Revision 1.1

  • Reviewed on 22 August 2026
  • Editorial owner: Marketing Plan in Action
  • Counter-example, blocking check and visible history added.
  • This revision describes the page; the CSV retains its own version field when present.

Explore the method