Structured template · MOD-14

Dependency map to download: fields and controls

Decision question

Which upstream delay could prevent a downstream initiative from starting or delivering?

Editable CSV file

The template’s required fields.

This file is used to secure, bypass or rephase a dependency before it blocks the roadmap. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.

01

Upstream object

Name the prerequisite.

A verifiable output is expected.
02

Downstream object

Identify what depends on the prerequisite.

The link is direct.
03

Required date

Fix the downstream need date.

It precedes the dependent start.
04

Fallback

Prepare a degraded mode.

Its cost and limit are visible.

Example structure

A concrete reading before completing the file.

Illustrative example to replace with plan data.
UpstreamDownstreamRequired dateFallback
Offer approvalMessages12 SeptemberRestricted version
PricingSales training20 SeptemberProvisional range

Checks before use

  • Direct link
  • Required date
  • Upstream owner
  • Documented fallback

Counter-example

Completing “Upstream object” without satisfying “A verifiable output is expected.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.

Editable resource

Download the template and retain its history.

Editable CSVDownload the dependency mapReview the example and acceptance criteria

Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.

Template traceability

Editorial revision of this page.

Revision 1.1

  • Reviewed on 22 August 2026
  • Editorial owner: Marketing Plan in Action
  • Counter-example, blocking check and visible history added.
  • This revision describes the page; the CSV retains its own version field when present.