Control · C21

Align objectives and initiatives

Question addressed

Does every initiative contribute to an explicit objective?

Direct answer

The control identifies objectives without action, actions without objectives and claimed contributions with no mechanism or evidence.

Decision supported

01Correct, justify or remove weak relationships.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

Does every initiative contribute to an explicit objective?

02Decision prepared

Correct, justify or remove weak relationships.

03Deliverable to use

Contribution matrix

Calculation · SQ-23

Calculate the weighted coverage of the objectives

Counting initiatives does not measure coverage. Every objective is weighted by its importance and every link by its level of evidence.

Working context

Illustrative check of four objectives supported by seven initiatives.

  1. 01Weight

    Assign a weight to the objectives before examining the initiatives.

  2. 02Link

    Document the contribution as primary, secondary or hypothetical.

  3. 03Calculate

    Multiply coverage and confidence by the weight of the objective.

  4. 04Correct

    Handle the critical objectives below 70% and the orphan initiatives.

Original element

Weighted coverage index: 64.2/100

The retention objective looks supported by two initiatives, but weak evidence reduces its real coverage.

Calculation methodWeighted coverage = Σ (objective weight × coverage × link confidence)
ObjectiveWeightInitiativesCoverageConfidencePoints
New pipeline35390%80%25.2
Conversion25280%90%18.0
Retention25275%40%7.5
Efficiency15395%95%13.5
Decision interpretation

01The reproducible score is 64.2; no bonus absent from the formula is added to the total.

02Retention is the priority despite two initiatives, because their contribution stays hypothetical.

03An initiative without a primary objective must be withdrawn or requalified before funding.

Illustrative method. Link confidence must rest on explicitly qualified evidence.

Coherence controls

Minimum conditions before validation.

01No orphan objective

The status, the evidence and the owner must be available for review.

02Funded initiatives

The status, the evidence and the owner must be available for review.

03Covered capacity

The status, the evidence and the owner must be available for review.

04Managed risks

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

Contribution matrix

Explore the decision further with an interactive control, or start from a structured template to produce your deliverable.