Contribution
Connect the initiative to an objective.
The contribution remains an explicit assumption.Structured template · MOD-06
Which initiatives should be funded, piloted, deferred or stopped using comparable criteria?
Editable CSV file
This file is used to compose a portfolio compatible with the objectives, budget and capacity. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.
Connect the initiative to an objective.
The contribution remains an explicit assumption.Add expenditure and internal workload.
The same convention applies throughout.Qualify the available level of support.
Missing evidence is not scored as zero.Assess the ability to stop or reduce.
Exit costs are visible.Example structure
| Initiative | Contribution | Cost | Decision |
|---|---|---|---|
| High-intent search | 4/5 | €95k | Fund |
| Partner programme | 4.2/5 | €70k | Pilot |
Completing “Contribution” without satisfying “The contribution remains an explicit assumption.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.
Editable resource
Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.
Template traceability
Explore the method