Structured template · MOD-02

Marketing framing brief to download: fields and controls

Decision question

Which information must be obtained before building the plan?

Editable CSV file

The template’s required fields.

This file is used to authorise framing or suspend work while critical information is missing. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.

01

Mandate

State the requested outcome and sponsor.

The expected decision fits in one sentence.
02

Scope

Define markets, offers, channels and horizon.

Exclusions are explicit.
03

Baseline

Retain a measurable starting point.

Date and source are stated.
04

Open questions

List unknowns that block the plan.

Every question has an owner and date.

Example structure

A concrete reading before completing the file.

Illustrative example to replace with plan data.
SectionContentOwnerDeadline
MandatePrepare the France launchMarketing leadership15 September
QuestionAvailable CRM capacityMarketing ops22 August

Checks before use

  • Signed mandate
  • Dated scope
  • Sourced baseline
  • Critical questions assigned

Counter-example

Completing “Mandate” without satisfying “The expected decision fits in one sentence.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.

Editable resource

Download the template and retain its history.

Editable CSVDownload the framing briefReview the example and acceptance criteria

Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.

Template traceability

Editorial revision of this page.

Revision 1.1

  • Reviewed on 22 August 2026
  • Editorial owner: Marketing Plan in Action
  • Counter-example, blocking check and visible history added.
  • This revision describes the page; the CSV retains its own version field when present.

Explore the method