Template · C56

Build a decision-ready marketing-plan brief

Question addressed

Does the brief contain enough information to begin without creating false consensus?

Direct answer

An eight-criterion grid distinguishes blocking, conditional and completable elements during the planning process.

Decision supported

01Accept the brief, accept it with conditions or suspend the start.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

Does the brief contain enough information to begin without creating false consensus?

02Decision prepared

Accept the brief, accept it with conditions or suspend the start.

03Deliverable to use

Eight-criterion brief gate

Decision grid · SQ-56

Decide whether the brief really allows work to start

A brief does not need to be exhaustive. It must, however, secure the irreversible decisions and make the unknowns visible.

Working context

Grid applied to a multi-offer annual plan. Each criterion receives 0, 1 or 2 points according to the evidence available.

  1. 01Distinguish

    Separate the blocking information from what can be completed during framing.

  2. 02Score

    Give 0 without evidence, 1 if partial or contested, 2 if validated.

  3. 03Block

    Suspend if the sponsor, the mandate or a non-negotiable constraint scores 0.

  4. 04Condition

    Attach every partial point to an owner and a resolution date.

Original element

Brief gate: 13/16, conditional start

The total guides the decision, but a zero on a blocking criterion overrides the average.

Calculation methodScore = Σ scores from 0 to 2; go ≥ 14, conditional go from 10 to 13, no-go < 10
CriterionExpected evidenceScoreBlocking if 0Action
SponsorName + availability2YesNone
MandateExpected decision2YesNone
ScopeIncluded + excluded1YesValidate two offers
HorizonStart and end dates2NoNone
BaselineComparable sources1NoNormalise CRM
ConstraintsBudget + capacity2YesNone
StakeholdersDecision-makers + contributors1NoName Finance
AssumptionsValue + confidence2NoNone
Decision interpretation

01The brief authorises the start, but the scope must be validated before any costing.

02The baseline can be normalised during framing because no irreversible spending depends on it yet.

03The three partial points become dated actions, not footnotes.

Working grid. The blocking criteria must be adapted to the decision rights of the organisation.

Coherence controls

Minimum conditions before validation.

01Identified sponsor

The status, the evidence and the owner must be available for review.

02Dated data

The status, the evidence and the owner must be available for review.

03Visible assumptions

The status, the evidence and the owner must be available for review.

04Declared out-of-scope

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

Eight-criterion brief gate

Explore the decision further with an interactive control, or start from a structured template to produce your deliverable.