Criterion
Define a distinct decision dimension.
Two criteria do not measure the same thing.Structured template · MOD-07
Does the ranking withstand a reasonable variation in weights and scores?
Editable CSV file
This file is used to adopt a priority order or request additional evidence. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.
Define a distinct decision dimension.
Two criteria do not measure the same thing.Make preferences explicit.
The sum equals 100%.Apply a documented scale.
Every score has a justification.Test another set of weights.
Ranking reversals are reported.Example structure
| Option | Value 40% | Effort 30% | Score |
|---|---|---|---|
| Option A | 4 | 2 | 3.4 |
| Option B | 3 | 4 | 3.3 |
Completing “Criterion” without satisfying “Two criteria do not measure the same thing.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.
Editable resource
Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.
Template traceability
Explore the method