Guide · C19

Define prioritisation criteria

Question addressed

Which criteria should be used to rank the initiatives?

Direct answer

Criteria must be defined, measurable, non-redundant, weighted and sensitivity-tested before any decision.

Decision supported

01Choose a trade-off rule that is understood and defensible.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

Which criteria should be used to rank the initiatives?

02Decision prepared

Choose a trade-off rule that is understood and defensible.

03Deliverable to use

Weighted grid

Decision grid · SQ-05

Prioritise four initiatives with an explicit weighting

The grid separates contribution, evidence, capacity, speed, reversibility and risk control. Sensitivity is tested before the decision.

Working context

Illustrative case: a portfolio of four initiatives for a B2B pipeline objective.

  1. 01Normalise

    Describe every initiative at the same level of cost, workload, horizon and evidence.

  2. 02Weight

    Fix the weights before scoring the options, to limit preference bias.

  3. 03Calculate

    Multiply each score from 1 to 5 by its weight, then add them up.

  4. 04Test

    Change the two most sensitive weights and observe the changes in rank.

Original element

Weighted matrix and sensitivity test

Weights used: contribution 35%, evidence 20%, capacity 15%, speed 15%, reversibility 10%, risk control 5%.

Calculation methodScore = Σ (criterion rating from 1 to 5 × criterion weight)
InitiativeContributionEvidenceCapacitySpeedReversibilityScore / 5
A · Enterprise webinar432343.30
B · High-intent search344553.90
C · Partner kit423243.10
D · Existing-content redesign255353.65
Decision interpretation

01B comes first thanks to speed and level of evidence.

02D overtakes B if the weight of capacity exceeds 30%: the order is therefore not robust to a strong team constraint.

03C deserves a limited test rather than full funding, because its estimated contribution rests on weak evidence.

Illustrative scores. A regulatory or contractual obligation must be separated from the discretionary ranking.

Coherence controls

Minimum conditions before validation.

01Non-redundant criteria

The status, the evidence and the owner must be available for review.

02Full cost

The status, the evidence and the owner must be available for review.

03Qualified evidence

The status, the evidence and the owner must be available for review.

04Sensitivity tested

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

Weighted grid

Explore the decision further with an interactive control, or start from a structured template to produce your deliverable.