Definition
Specify what is included and excluded.
The label does not replace the definition.Structured template · MOD-05
How can two teams be prevented from calculating the same indicator differently?
Editable CSV file
This file is used to adopt a shared definition before using the KPI in a trade-off. The related guide page explains the method. Here, the scope is limited to the columns, checks and example needed to complete the deliverable.
Specify what is included and excluded.
The label does not replace the definition.Make the calculation reproducible.
Numerator and denominator are named.Identify system, table and date.
One source is authoritative.Link the KPI to an action.
Watch and action levels are distinct.Example structure
| KPI | Formula | Frequency | Action threshold |
|---|---|---|---|
| Win rate | Contracts / opportunities | Monthly | < 22% |
| CAC | Full cost / customers | Monthly | > €1,400 |
Completing “Definition” without satisfying “The label does not replace the definition.” creates a present but unacceptable deliverable. The row must remain blocked until corrected.
Editable resource
Original planning template. The example values are neither a benchmark nor an automatic recommendation. Adapt units, thresholds and ownership to the scope that was actually decided.
Template traceability
Explore the method