Guide · C14

Choose the marketing-plan KPIs

Question addressed

Which KPIs should steer the marketing plan?

Direct answer

A useful KPI has a definition, unit, frequency, owner, threshold and associated action.

Decision supported

01Remove metrics that change no decision.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

Which KPIs should steer the marketing plan?

02Decision prepared

Remove metrics that change no decision.

03Deliverable to use

KPI dictionary

Critical comparison · SQ-04

Compare four KPI architectures before choosing

A KPI architecture is judged on its ability to trigger an action, its latency, its measurement cost and the risk of causal misreading.

Working context

Critical comparison applied to a B2B demand generation plan.

  1. 01List the decisions

    Name the actions the measurement system must be able to trigger.

  2. 02Classify the signals

    Separate activity, progression, result and guardrails.

  3. 03Compare

    Assess each architecture against five constant criteria.

  4. 04Limit

    Keep the minimum number of indicators that allows action without hiding uncertainty.

Original element

Four methods, five decision criteria

Scores run from 1 (weak) to 5 (strong). A high causality score means that the method limits unwarranted conclusions.

MethodActionabilityLatencyCausalityMeasurement costVerdict
Activity metrics2/55/51/55/5Useful for workload, insufficient for decisions
Static funnel3/53/52/54/5Readable, but hides time and cohorts
Leading / lagging tree5/54/54/53/5Best compromise for steering
Single north star2/52/52/55/5Concise, too weak to correct
Decision interpretation

01The leading / lagging tree is retained when several teams can act on distinct nodes.

02The static funnel stays useful for a committee reading, but must be completed by cohorts.

03A north star replaces neither the quality guardrails nor the capacity measures.

Methodological assessment, not a universal ranking. The best architecture depends on the decisions and on data quality.

Coherence controls

Minimum conditions before validation.

01Baseline present

The status, the evidence and the owner must be available for review.

02Dated target

The status, the evidence and the owner must be available for review.

03Actionable KPI

The status, the evidence and the owner must be available for review.

04Named owner

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

KPI dictionary

Explore the decision further with an interactive control, or start from a structured template to produce your deliverable.

Next reading · C15Build a KPI tree