Gather the data needed for the marketing plan

Question addressed

Which data must be gathered before building the plan?

Direct answer

The minimum covers the baseline, results, costs, workload, constraints, commitments, dependencies and source quality.

Decision supported

01Separate indispensable data from useful but non-blocking information.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

Which data must be gathered before building the plan?

02Decision prepared

Separate indispensable data from useful but non-blocking information.

03Deliverable to use

Data inventory

Calculation · SQ-19

Calculate a data readiness index

Not every missing item of data blocks the plan. The index weights availability, quality, freshness and ownership according to the decision supported.

Working context

Illustrative assessment of five data sets before building the annual plan.

  1. 01Prioritise

    Weight the data sets according to the decisions they condition.

  2. 02Score

    Assess availability, quality, freshness and ownership from 0 to 5.

  3. 03Calculate

    Convert the scores into weighted points.

  4. 04Block

    Distinguish blocking gaps from improvements that can wait.

Original element

Readiness index: 67/100

The capacity measure gets the lowest score and directly conditions feasibility.

Calculation methodDRI = Σ [(average of the 4 criteria ÷ 5) × dataset weight]
DatasetWeightAvailableQualityFreshnessOwnerPoints
Sales performance25545523.8
Marketing costs20434516.0
Capacity by role25223211.3
Channel performance20534416.0
Product dependencies1032235.0
Decision interpretation

01The gross total of 72.1 is brought down to 67 after a 5-point penalty for a blocking data set below 50%.

02Capacity by role must be made reliable before budget validation.

03Product dependencies can stay estimated if they are declared as assumptions and dated.

Illustrative method. The weights must reflect the decisions of the plan, not how easy the data is to obtain.

Coherence controls

Minimum conditions before validation.

01Identified sponsor

The status, the evidence and the owner must be available for review.

02Dated data

The status, the evidence and the owner must be available for review.

03Visible assumptions

The status, the evidence and the owner must be available for review.

04Declared out-of-scope

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

Data inventory

Explore the decision further with an interactive control, or start from a structured template to produce your deliverable.