Formalise the plan assumptions

Question addressed

How can uncertainty be made visible and reviewable?

Direct answer

Every assumption needs a value, confidence level, impact, owner, review date and trigger threshold.

Decision supported

01Choose which assumptions should become conditional decisions.

02The rule, the evidence and the next review date stay visible.

How to use this

Move from the question to the deliverable.

01Starting point

How can uncertainty be made visible and reviewable?

02Decision prepared

Choose which assumptions should become conditional decisions.

03Deliverable to use

Assumption register

Worked example · SQ-18

Test two assumptions before committing €600k

An assumption becomes steerable when a quantified variation changes a decision, a threshold or a scenario.

Working context

Illustrative simulation crossing acquisition cost and conversion rate for a target of 120 contracts.

  1. 01State

    Write a central value, a range and a source.

  2. 02Cross

    Test jointly the assumptions that reinforce each other.

  3. 03Set thresholds

    Identify the combinations that make the plan unviable.

  4. 04Trigger

    Attach each threshold to a decision and a verification date.

Original element

Sensitivity of CAC × conversion rate

The media budget available is €600k. The cells show the budget needed to obtain 120 contracts.

Calculation methodRequired budget = target contracts ÷ conversion rate × acquisition cost
CAC / Conversion20%25%30%Interpretation
€800€480k€384k€320kRobust
€1,000€600k€480k€400kThreshold at 20%
€1,250€750k€600k€500kConditional
€1,500€900k€720k€600kNot viable unless 30%
CSV · values, thresholds and triggersDownload the assumption register
Decision interpretation

01The central scenario at €1,250 and 25% consumes the envelope exactly.

02If the CAC exceeds €1,250, the conversion rate must reach 30% or the target must be reduced.

03The first verification date must fall before the irreversible commitment of the second half of the budget.

Fictitious and simplified simulation. It includes neither the conversion delay nor internal costs.

Coherence controls

Minimum conditions before validation.

01Identified sponsor

The status, the evidence and the owner must be available for review.

02Dated data

The status, the evidence and the owner must be available for review.

03Visible assumptions

The status, the evidence and the owner must be available for review.

04Declared out-of-scope

The status, the evidence and the owner must be available for review.

Usable deliverable

Output produced

Assumption register